﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:urlManipulator="urn:urlManipulator" xmlns:dateManipulator="urn:dateManipulator">
  <!--This RSS Feed was generated from WSDOT's news web service.  The service may be found here:
http://www.wsdot.wa.gov/public/webservices/newswebservice.asmx

Parameters may be used in the QueryString to narrow the items returned by this RSS feed.

The "count" parameter may be used to limit the number of items returned to that number.

The "office", "area" and "category" parameters may be use to narrow the items returned to
items regarding that office, area or category.

Offices includes Aviation, Eastern, Headquarters, Local Programs, North Central, Northwest,
Olympic, PTR, South Central, and Southwest.

Areas include King, Snohomish, Snoqualmie, Baker, Grays Harbor, Kitsap,
North Olympic Penisula, South Puget Sound, Columbia River Gorge, Lewis, Southwest Coast,
Vancouver, Columbia Basin, Okanogan, Wenatchee, Yakima, Tri-Cities, Colville, Pullman, Spokane,
and Walla Walla.

Categories include Travel Info,  Projects and Issues, and Public Involvement.

Examples:
default.xml?area=South+Puget+Sound
default.xml?area=Spokane&amp;count=5
default.xml?office=Northwest&amp;category=Travel+Info-->
  <channel>
    <title>WSDOT - News</title>
    <link>http://www.wsdot.gov/News/</link>
    <copyright>
          Copyright WSDOT 2008. All rights reserved.
        </copyright>
    <description>Washington State Department of Transportation News</description>
    <managingEditor>
          bertraj@wsdot.wa.gov (Jeremy Bertrand)
        </managingEditor>
    <generator>
          Washington State Department of Transportation
        </generator>
    <lastBuildDate>Fri, 18 May 2012 19:32:12 GMT</lastBuildDate>
    <ttl>
          15
        </ttl>
    <image>
      <title>WSDOT - News</title>
      <url>http://www.wsdot.gov/Public/images/nav/wsdot2g4.gif</url>
      <link>http://www.wsdot.gov/News/</link>
    </image>
    <item>
      <title>Repair work to delay float-out of SR 520 bridge pontoons</title>
      <pubDate>Sat, 19 May 2012 01:09:16 GMT</pubDate>
      <link>http://www.wsdot.gov/News/2012/05/18_SR520PontoonFloatoutDelay.htm</link>
      <guid>http://www.wsdot.gov/News/2012/05/18_SR520PontoonFloatoutDelay.htm</guid>
      <description>SEATTLE – Float-out of the first six concrete pontoons for the new State Route 520 floating bridge will be delayed to allow crews time to make repairs and modifications after damaged concrete was found in one of the pontoons.</description>
    </item>
    <item>
      <title>I-5 paving between Kalama and Woodland starts May 21</title>
      <pubDate>Fri, 18 May 2012 23:04:36 GMT</pubDate>
      <link>http://www.wsdot.gov/News/2012/05/18_I5PavingWoodland.htm</link>
      <guid>http://www.wsdot.gov/News/2012/05/18_I5PavingWoodland.htm</guid>
      <description>Starting Monday, May 21, Cowlitz County drivers will see this tell-tale sign of construction on eight miles of Interstate 5 between the East Fork Lewis River Bridge and Todd Road, and on State Route 503 in downtown Woodland.</description>
    </item>
    <item>
      <title>SR 520 design open house planned May 19 in Seattle</title>
      <pubDate>Thu, 17 May 2012 05:49:05 GMT</pubDate>
      <link>http://www.wsdot.gov/News/2012/05/16_SR520_OpenHousePortageBayBridge.htm</link>
      <guid>http://www.wsdot.gov/News/2012/05/16_SR520_OpenHousePortageBayBridge.htm</guid>
      <description>SEATTLE – The public can view conceptual designs for a new State Route 520 bridge across Portage Bay – including possible cable-stay options – at an open house Saturday, May 19. The meeting is the latest opportunity for the public to give feedback as the Washington State Department of Transportation refines designs for the corridor from I-5 to the floating bridge.</description>
    </item>
    <item>
      <title>Bridges to replace I-90 Snoqualime Pass snowshed</title>
      <pubDate>Wed, 16 May 2012 21:57:15 GMT</pubDate>
      <link>http://www.wsdot.gov/News/2012/05/16_12+Bridges+to+replace+snowshed.htm</link>
      <guid>http://www.wsdot.gov/News/2012/05/16_12+Bridges+to+replace+snowshed.htm</guid>
      <description>It’s one of the biggest changes to come to Interstate 90 east of Snoqualmie Pass since it was expanded to a four-lane highway more than 40 years ago and it will save millions of dollars: The snowshed is coming down and bridges are going up.</description>
    </item>
    <item>
      <title>SR 99 Alaskan Way Viaduct to close this weekend, May 18-21</title>
      <pubDate>Tue, 15 May 2012 23:24:06 GMT</pubDate>
      <link>http://www.wsdot.gov/News/2012/05/15_AWV-closed-5-18-21.htm</link>
      <guid>http://www.wsdot.gov/News/2012/05/15_AWV-closed-5-18-21.htm</guid>
      <description>Crews will close the State Route 99 Alaskan Way Viaduct this weekend to continue reinforcing a two-block section of the structure located above the route of the future SR 99 tunnel.</description>
    </item>
  </channel>
</rss>
